CASE STUDY

Assembled Electrical Solution

Wesco’s Assembled Electrical solutions make it easier for your project  to open on time, saves time and space while reducing installation time and job site errors.
 

Wesco Retail and Commercial

About Us

A trusted leader in the design and integration of electrical distribution equipment, Wesco Retail and Commercial offers first-class technical  expertise, supply chain services, value, and overall profitability to  clients in the retail and restaurant marketplace. We design tailor-made,  scalable electrical systems that save space and reduce labor costs. These solutions are factory assembled, ready for installation, and  shipped directly to the job site.

A Custom, Compact and Cost-Effective Solution

Our assembled electrical solution is customized to meet a national  restaurant chain’s specific requirements. In addition to solving their desire for site-to-site consistency, our product improves both the  reliability and integrity of their electrical distribution system. 



A national restaurant chain case study demonstrated space savings of 40% and time savings 55–65 labor hours.

 

National restaurant franchises know exactly what they are getting  even before construction ever begins. The main distribution panel  as well as the lighting and power panels are factory installed, wired  and tested. Smart breakers are used for lighting control to meet code  and help save money by reducing energy usage. The smart breakers  are factory installed, wired and tested. The space savings gained over traditional loose equipment installation exceeds 40%. This allows  a national restaurant chain to use the saved square footage for additional revenue generating or storage space.

The Components

  • Pow-R-Command e-Lighting control
  • TVSS protection
  • Power and lighting panels
  • Main distribution panel
  • HVAC, hood, and lighting controls

Space Savings

An assembled electrical solution is only 66 inches wide, which is a space savings of 40% versus traditional wall mounted equipment. Additionally, the National Electrical CodeT requires 3 feet of working clearance in front of electrical equipment. This resulted in a net floor space savings of 30 square feet.

Time Savings

The Assembled Electrical Solution arrives at the job site factory wired and ready to install. More importantly,  the Wesco project management team works to ensure  that the units arrive on time. This combination can save  the electrical contractor up to 8 days of installation time. This accelerates the turnover process, which helps a national restaurant chain to open on time and begin generating revenue.




Wesco Retail and Commercial Value-Adds

The increased reliability of the assembled electrical solution helps minimize change orders resulting in significant time and cost savings. In addition,  the Wesco Retail and Commercial team quickly and efficiently handles all warranty claims.