CASE STUDY

Wesco Energy Solutions Case Study: Campus Lighting Upgrade


Challenge

A large state university was facing inflated energy costs due to outdated lighting across its facilities. Over the past decade, inconsistent lighting replacements had created a scattered and non-uniform appearance throughout the campus. Critical areas, such as laboratories and parking garages, also suffer from inadequate lighting conditions causing a safety hazard. In addition, frequent bulb replacements were creating extra work for the maintenance team.

Wesco Energy Solutions partnered with our global accounts team to execute multiple site lighting upgrades for the university.

Solution

The Wesco Energy Solutions team designed a comprehensive lighting solution to upgrade the entire campus. By utilizing the Sourcewell contract and local energy incentives, we simplified the sales process and saved valuable time by eliminating the need for bids. The team provided a complete turnkey solution, which included an investment-grade audit and a $1.3 million utility rebate. This significantly helped offset the project costs.

Results

  • Generated a return on investment (ROI) within 7 years based on annual savings of $300,000 in energy and maintenance costs.
  • Projects completed on a tight timeline, resulting in a $1.3 million rebate from the utility company.
  • Achieved sustainability goals quickly and easily.
  • Saved money on future energy bills.

Are you ready to score an A+ on energy savings? Contact us today at energysolutions@wesco.com to get started.